The improvements under this project include full reconstruction and new construction along Krome Ave. The scope of work is to widen the Krome corridor from an undivided 2 lane road to a 4 lane divided facility (2 lanes each way) and a 40’ median. The list of activities includes: Reconstructing roadway and shoulders, demolition and removal of 2 existing bridges over C-6 Canal and posterior construction of two 150’ single span bridges over C-6 Canal, installing guardrail, installing a new drainage system and installing new lighting, new stripping, and new signalization.
Solid Consulting Engineers supports the FDOT D6 project by providing a CEI Roadway Inspector Aide. This professional assists with ensuring quality control and adherence to specifications during the reconstruction and bridge construction on Krome Avenue. Their duties may involve tasks such as: Monitoring construction activities for compliance with plans and standards, Recording and reporting observations and potential issues, Assisting with data collection and documentation, Supporting communication between inspectors and construction crews
By providing this essential service, our client contributes to the successful completion of this critical infrastructure project.
| Financial Number: | 249615-5 |
|---|---|
| Project Length: | 3.1 miles |
| Start Date: | April 2016 |
| Completion Date: | March 2017 |
| Estimated Construction Cost: | $18.9 million |
| FDOT Project Manager: | John Garzia, PE. |
| SOLID’s scope of work: | Provided CEI Roadway Inspector Aide |