Project improvements include replacing the bridge over the North Fork of the New River, removing old asphalt and resurfacing the roadway, upgrading crosswalk ramps to meet ADA requirements, upgrading signs and pavement markings, relocating bus shelters, adding roadway lighting, installing drainage structures, upgrading signalized intersections to mast arms, reconstructing sidewalks, and widening roadway to add bike lanes in each direction. Inspection duties include monitoring clearing and grubbing, performing MOT and environmental weekly inspections, documenting pile driving and concrete pours for pile caps and bridge bents along with bearing pads, roller pads and metal deck installation for the proprietary ACROW bridge system as well as inspection of containment system for the demolition of existing lead painted bridge parapets.
Solid Consulting Engineers plays a critical role in the Broward Boulevard reconstruction project (18th Ave. - US 1) by providing a CEI Roadway/Bridge Inspector. Their comprehensive inspections ensure quality and adherence to specifications across various aspects, including: bridge replacement over the North Fork of the New River, roadway resurfacing, sidewalk reconstruction, and bike lane addition, upgrading crosswalks, signs, pavement markings, and traffic signals, installing lighting, drainage structures, and bus shelters, monitoring environmental and construction activities.
Solid Consulting Engineers' expertise contributes significantly to the project's success, guaranteeing a safe, accessible, and improved transportation corridor for the community.
| Financial Number: | 432949-1-62-01 |
|---|---|
| Project Length: | 0.9 miles |
| Start Date: | October 7, 2016 |
| Completion Date: | Summer 2018 |
| Estimated Construction Cost: | $16 million |
| FDOT Project Manager: | Yves Jean Pierre, PE |
| SOLID’s scope of work: | Providing CEI Roadway / Bridge Inspector |