Project improvements include adding a 5-foot sidewalk along the west side of Flamingo Road, upgrading pedestrian ramps and sidewalks to meet current ADA standards, adding pedestrian poles at SW 36th Court, removing old asphalt and resurfacing Flamingo Road within project limits, upgrading existing guardrail to meet current safety standards, signing and pavement marking improvements. Other improvements include installing 2 overhead signs to guide motorists towards major thoroughfares such as I-75, I-595, I-95, Griffin Road, and State Road 84, drainage improvements at SW 26th Street, and widening Flamingo Road at specified areas to accommodate bus bays and continuous bicycle lanes.
Solid Consulting Engineers plays a vital role in ensuring the quality and safety of the FDOT D4 Flamingo Road improvement project by providing a CEI Roadway Inspector. This professional performs crucial tasks to oversee various aspects of the project, including: inspecting construction activities for compliance with plans and specifications, identifying and reporting potential safety hazards or deficiencies, verifying the quality of materials and workmanship Ensuring adherence to ADA accessibility standards, providing documentation and reports to relevant authorities.
By contributing their expertise, our client helps to guarantee the successful completion of this project, promoting safer and more accessible infrastructure for the community.
| Financial Number: | 427012-1-32-01 |
|---|---|
| Project Length: | 3.23 miles |
| Start Date: | November 23, 2015 |
| Completion Date: | December 22, 2016 |
| Estimated Construction Cost: | $4.14 million |
| FDOT Project Manager: | Yveins Jean-Pierre, PE. |
| SOLID’s scope of work: | Provided CEI Roadway Inspector. |